Pound Ridge Community Church
3 Pound Ridge Road
Pound Ridge, NY 10576
ph: 914 764-9000
prcc
Below are a several recent events at our church...
November 18th, 2007
On Sunday afternoon, November 18th, 2007, beginning at 3:00 pm, a special service and time of celebration was held. Celebrated was the consecration of the new four-stop elevator that provides full accessibility to all levels of the church and education wings. Joining us for this special time was Bishop Jeremiah Park, resident Bishop of the New York Area of the United Methodist Church ….

Elevator as seen from the sanctuary

Bishop Jeremiah Park offers words of welcome and encouragement
At a 2006 Church Conference the commitment to make the church fully wheel-chair accessible was made. This work began in the spring of 2007 and is completed as of September. The project entailed the installation of a four-stop elevator to provide access to the two floors in the sanctuary building as well as the two floors in the education wing. Accompanying changes to the interior and exterior of the buildings were necessary, including a new accessibility entranceway. Below are recent photos of the exterior additions:

The exterior of the church and education wing showing the roof extension for the elevator shaft as well as the new entranceway.

A view looking up the new walkway toward the new entranceway.
A close-up of the new entranceway -- the elevator itself is inside the building to the left.

Join us and share in our exciting future!
Contact us today!
3 Pound Ridge Road
Pound Ridge, NY 10576
ph: 914 764-9000
prcc